| Before |
After |
| The
Groundbreaking |
 |
The truck has arrived at Fratelli's of Derby to
begin the installation of their lean to
retractable enclosure on their outdoor patio |
| The pieces of the enclosure
are craned up onto the cement patio to be sorted
and installed. |
 |
 |
Once secured they can be
moved to the installers |
| Each roof portion of the
enclosure is lifted by the crane over to the
installers waiting to fix it to the wall track. |
 |
 |
Now the front wall is put
into place and secured with a gusset |
| The second bay is now up and
successfully attached |
 |
 |
Here we see the enclosure
from an inside view showcasing the custom work
on this enclosure that gives it a look similar
to lattice. |
| Jason installs the next
portion of the track and insures that it is
level |
. |
 |
The bays are opened and
closed to make sure that everything is working
as it should |
| The enclosure is up with the
exception of the end walls which in this case is
the last portion of the installation |
 |
 |
Owner Nick B is seen here
over seeing the installation with a smile on his
face. |
|
|
 |
 |
|
|
|
 |
 |
|
|
|
 |
 |
|
|
|
 |
 |
|
|
|
 |
 |
|
|
|
 |
 |
|
|
|
|