At the site of the Boucarou Lounge the area has been prepped and the Roll A Cover team is on the way to start the installation
Jason, one of our installation specialists sits and waits anxiously as the pieces of the enclosure are being delivered.
The enclosure pieces are brought up to site and the installation is about to begin
This excavator was used instead of a crane due to the relatively low height of the building