Boucarou Lounge

At the site of the Boucarou Lounge the area has been prepped and the Roll A Cover team is on the way to start the installation

Jason, one of our installation specialists sits and waits anxiously as the pieces of the enclosure are being delivered.

The enclosure pieces are brought up to site and the installation is about to begin

This excavator was used instead of a crane due to the relatively low height of the building

And the first pieces of the enclosure are lifted into place
The crew secures the bay and gets ready to lower it into position
The installation team holds the bay in place while it is attached to a track
The excavator lifts yet another piece of the enclosure up to the installation team
Kevin Garrick secures the bay as the excavator gets ready to release another bay
Here we see the first few bays installed and in place
Another view of the bays from the inside
The side walls have been put on at this point and some final construction on the building is being conducted.
A closer look at how the enclosure sits on guiding wall
Finally another completed rooftop enclosure by the Roll A Cover team.