The Colonnades
   

Completed Installation

   
The installation is about to begin at the Colonnades Condominiums, located directly on the beach in Alabama, and the project managers take time to pose for a picture before the work begins.
Here we see the pool before the installation process starts
Here is a profile view of the area the Roll A Cover will be installed on.
The pieces of the enclosure have been taken off the truck and are brought to the base of the deck.
This picture truly shows the grand scope of this job and the sheer size of the building this enclosure will be on.
The bays are beginning to be lifted and are being put into place to be hoisted by crane, onto the deck.
Ladders are put into place to allow the installation staff easy access to the track that the Roll A Cover will roll on
The side wall here is being put into place and secured by a high impact, heavy duty gusset.
The gusset is slid into place...
...and securely snapped into the side wall
The crane has arrived to lift the bays up onto the deck for the installation team.
More bays are lifted and positioned for the enclosure by the installation staff
Another bay is being ready to be attached to the side wall
The roof and the wall sections are snapped into place and secured with the gusset
A look down from the top of the building below
The crane has been put into action and starts to lift the bays up to the deck
Up up and away the crane goes lifting the bays
Another bay is lifted up to the deck section for the install team
Kevin, one of out plant supervisors secures the bay to the track it is lifted by the crane

Kevin takes a moment to pose on the beach
More sections of the enclosure are lifted by the crane
The enclosure is starting to take shape as bays are fixed to the side wall.
Three bays have now been installed and the telescopic nature of the enclosure is starting to take shape
The enclosure is checked for stability by the installation team and all parts are verified to be working correctly
Yet another bay of the enclosure is listed up for the installation team
The bays are installed and retracted to test the full working range of motion of the enclosure
This is a close up view of the track system on the wall that allows the lean to unit to roll with ease
The track is securely bolted into place and the levelness is ensured
Here is a profile view of the side wall as the enclosure is being put into place
The side wall is now completed
The other side wall is having some finishing touches added
Here we see a top down view of the enclosure as it is almost entirely completed
The enclosure is now completed and we see it in its open state
and now we see it closed
A beautiful view of the side wall from the ground looking up
Here is a spectacular view of the inside of the enclosure as it is opened to enjoy the beautiful view of the beach
The same view from the other side the enclosure
The pool has now been filled and the enclosure is opened for all of the condo owners to enjoy
The inside of the finished pool area with the enclosure closed.
And finally we get to see yet another top down view of the unit after being fully decorated.