The Hotel Gansevoort
 

Completed Installation

 
Here we see the crane lifting the bays of the Roll A Cover up to the rooftop bar.
The view of the bays from the eyes of the workers waiting to unload them.
Almost there
The bays have arrived!
 
The first bays are put into place.
Dave Pate gets a close look at the track to make sure that everything is lined up correctly
The gussets are secured to make sure that the top and bottom of each bay are locked in place
The second bay has now been installed
Here we look up as most of the bays have now been set into place.
A side view of the almost finished enclosures, all that is needed now is the sidewalls.

The sidewalls are raised to the roof as the assembly teams waits to  install them.
Kevin Garrick, one of our plant managers assists in installing the side wall of the unit.
Almost done....
Here we see the finished enclosure from the inside, looking at the beautiful decorations
An outside view of the completed side wall as well as the door
Here we see the patrons of the Hotel Gansevoort enjoying the rooftop bar as the sun sets over New York City
At last the project is completed and everyone has gone home.  The enclosure is installed and The Hotel Gansevoort has gotten their newest addition.